Photos



Feedback Form
Previous. All pages. Next. Page 1. Page 2. Page 3in  columns

This image shows the progress made at the East Toba powerhouse between our June and July documentation photos.

TM camp crates

Toba Buried Penstock

Toba Buried Penstock Awaiting Further Sections To Be Added

Toba Penstock in the Trench

Toba Penstock Sections Connected

Toba Powerhouse and Penstock Alignment 2

Toba Powerhouse with Distributor Pipes Going to Turbine Housing

Toba Powerhouse with Penstock Alignment in Background

Welding and Grinding Inside the Penstock

Workers at the Montrose intake have made remarkable progress. At the time of our June documentation, this site was still bare rock.

Workshop
Previous. All pages. Next. Page 1. Page 2. Page 3in  columns
 © 2010 Plutonic Power Corporation. All rights reserved. All material used and displayed on this website, including but not limited to photographs, videos, text, graphics and images ("Content") is the property of Plutonic Power Corporation or its suppliers. All Content is protected under Canadian and international copyright laws and treaties. You may temporarily download Content for personal transitory viewing, provided that: (a) use of the Content is for informational and non-commercial personal use only and no Content may be copied or posted on any network computer, used for public display or broadcast in any media, and (b) no modification of any Content is made. The reproduction, distribution, performance, display, retransmission, broadcast, modification, dissemination, and any use other than non-commercial, non-public personal use, of any Content is expressly prohibited without the prior written permission of Plutonic Power Corporation. To inquire about the use of any Content on this website, please contact us @ 604-669-4999 or info@plutonic.ca.
Suite 600 : 888 Dunsmuir Street : Vancouver, BC : Canada : V6C 3K4