Aerial view of the East Toba powerhouse construction site
|
|

Aerial view of the Montrose powerhouse centre image site preparations
|
|

construction at the East Toba powerhouse site
|
|

East Toba Penstock grinding mitred elbow welds
|
|

East Toba penstock in trench
|
|

East Toba penstock positioned in trench
|
|

East Toba runner pit roof slab reinforcement
|
|

Generation infrastructure continues to arrive at site East Toba turbine distributor
|
|

Montrose transformer at Toba
|
|

penstock stockpile yard in the Toba Valley
|
|

Reinforcing bar in East Toba powerhouse
|
|

stringing sock line to pull the conductor approximately 70km of the 3 phase conductor is in place
|
|