Toba Powerhouse with Penstock Alignment in Background

Toba Powerhouse with Distributor Pipes Going to Turbine Housing

Toba Powerhouse and Penstock Alignment 2

The Never Ending Job of Tying Rebar

And Still More Rebar

Toba Penstock in the Trench

Welding and Grinding Inside the Penstock

Toba Penstock Sections Connected

Toba Buried Penstock

Toba Buried Penstock Awaiting Further Sections To Be Added

East Toba River Temporary Diversion Around Intake Under Construction

East Toba River Temporary Diversion Around Intake Under Construction 2

Montrose Powerhouse Site at Left With Penstock Face

Gravel Yard at Montrose

Penstock Yard
 © 2010 Plutonic Power Corporation. All rights reserved. All material used and displayed on this website, including but not limited to photographs, videos, text, graphics and images ("Content") is the property of Plutonic Power Corporation or its suppliers. All Content is protected under Canadian and international copyright laws and treaties. You may temporarily download Content for personal transitory viewing, provided that: (a) use of the Content is for informational and non-commercial personal use only and no Content may be copied or posted on any network computer, used for public display or broadcast in any media, and (b) no modification of any Content is made. The reproduction, distribution, performance, display, retransmission, broadcast, modification, dissemination, and any use other than non-commercial, non-public personal use, of any Content is expressly prohibited without the prior written permission of Plutonic Power Corporation. To inquire about the use of any Content on this website, please contact us @ 604-669-4999 or info@plutonic.ca.