:Show image 'Progress over the past few months on the East Toba powerhouse.' in New Window:
--
Progress over the past few months on the East Toba powerhouse.
1396 KB, approx. 4 minutes, 21 seconds at 56.6Kbps
--
:Show image 'East Toba powerhouse with backfill nearly complete. The mouth of the tailrace can be seen centre-front of the photo.' in New Window:
--
East Toba powerhouse with backfill nearly complete. The mouth of the tailrace can be seen centre-front of the photo.
209 KB, approx. 40 seconds at 56.6Kbps
--
:Show image 'More rebar is swung on to the floor platform by crane and positioned by a Kiewit worker.' in New Window:
--
More rebar is swung on to the floor platform by crane and positioned by a Kiewit worker.
163 KB, approx. 31 seconds at 56.6Kbps
--
:Show image 'Rebar being tied within the powerhouse floor slab.' in New Window:
--
Rebar being tied within the powerhouse floor slab.
246 KB, approx. 47 seconds at 56.6Kbps
--
:Show image 'An aerial view over the East Toba Powerhouse and up the penstock alignment.' in New Window:
--
An aerial view over the East Toba Powerhouse and up the penstock alignment.
118 KB, approx. 23 seconds at 56.6Kbps
--
:Show image 'View from the East Toba Powerhouse up the penstock alignment.' in New Window:
--
View from the East Toba Powerhouse up the penstock alignment.
123 KB, approx. 24 seconds at 56.6Kbps
--
:Show image 'Positioning a penstock connection for welding.' in New Window:
--
Positioning a penstock connection for welding.
122 KB, approx. 24 seconds at 56.6Kbps
--
:Show image 'Tack welding guides to the penstock in preparation for the next pipe section.' in New Window:
--
Tack welding guides to the penstock in preparation for the next pipe section.
107 KB, approx. 21 seconds at 56.6Kbps
--
:Show image 'Looking down the penstock to the East Toba powerhouse.' in New Window:
--
Looking down the penstock to the East Toba powerhouse.
109 KB, approx. 21 seconds at 56.6Kbps
--
:Show image 'Aerial view of the East Toba intake structure. (1)' in New Window:
--
Aerial view of the East Toba intake structure. (1)
177 KB, approx. 34 seconds at 56.6Kbps
--
:Show image 'Aerial view of the East Toba intake structure. (2)' in New Window:
--
Aerial view of the East Toba intake structure. (2)
182 KB, approx. 35 seconds at 56.6Kbps
--
:Show image 'Rebar on the spillway at the East Toba intake.' in New Window:
--
Rebar on the spillway at the East Toba intake.
214 KB, approx. 41 seconds at 56.6Kbps
--
:Show image 'Head gate portal and transition structure to the penstock at the East Toba intake.' in New Window:
--
Head gate portal and transition structure to the penstock at the East Toba intake.
124 KB, approx. 24 seconds at 56.6Kbps
--
:Show image 'Inside, looking out through the transition structure.' in New Window:
--
Inside, looking out through the transition structure.
162 KB, approx. 31 seconds at 56.6Kbps
--
:Show image 'Aerial view over the Montrose intake structure, looking down the valley. Water flows through the temporary diversion to the right in the photo.' in New Window:
--
Aerial view over the Montrose intake structure, looking down the valley. Water flows through the temporary diversion to the right in the photo.
112 KB, approx. 22 seconds at 56.6Kbps
--
:Show image 'Aerial view over the Montrose intake structure.' in New Window:
--
Aerial view over the Montrose intake structure.
187 KB, approx. 36 seconds at 56.6Kbps
--
:Show image 'Aerial view over the Montrose intake structure. Looking upstream.' in New Window:
--
Aerial view over the Montrose intake structure. Looking upstream.
180 KB, approx. 34 seconds at 56.6Kbps
--
:Show image 'Concrete formwork in place at the Montrose intake structure.' in New Window:
--
Concrete formwork in place at the Montrose intake structure.
118 KB, approx. 23 seconds at 56.6Kbps
--
:Show image 'The concrete walls from the bottom of the spillway collector channel.' in New Window:
--
The concrete walls from the bottom of the spillway collector channel.
66 KB, approx. 13 seconds at 56.6Kbps
--
:Show image 'Rebar and channel ties ready for an abutting concrete wall to be formed and poured.' in New Window:
--
Rebar and channel ties ready for an abutting concrete wall to be formed and poured.
173 KB, approx. 33 seconds at 56.6Kbps
--
:Show image 'Crews connecting ends of the conductor cable on the transmission line. (1)' in New Window:
--
Crews connecting ends of the conductor cable on the transmission line. (1)
125 KB, approx. 24 seconds at 56.6Kbps
--
:Show image 'Crews connecting ends of the conductor cable on the transmission line. (2)' in New Window:
--
Crews connecting ends of the conductor cable on the transmission line. (2)
106 KB, approx. 21 seconds at 56.6Kbps
 © 2010 Plutonic Power Corporation. All rights reserved. All material used and displayed on this website, including but not limited to photographs, videos, text, graphics and images ("Content") is the property of Plutonic Power Corporation or its suppliers. All Content is protected under Canadian and international copyright laws and treaties. You may temporarily download Content for personal transitory viewing, provided that: (a) use of the Content is for informational and non-commercial personal use only and no Content may be copied or posted on any network computer, used for public display or broadcast in any media, and (b) no modification of any Content is made. The reproduction, distribution, performance, display, retransmission, broadcast, modification, dissemination, and any use other than non-commercial, non-public personal use, of any Content is expressly prohibited without the prior written permission of Plutonic Power Corporation. To inquire about the use of any Content on this website, please contact us @ 604-669-4999 or info@plutonic.ca.