Site Search
Home
Contact
Media Coverage
Media Materials
Photos
Bid Submission
Toba Montrose Activities
December 08 Update
February 09 Update
April 09 Update
May 09 Update
June 09 Update
July 09 Update
September 09 Update
March 10 Update
Dokie Wind Activities
April 2010 Update
Take the Clean Quiz!
What is Run-of-River?
FAQ
Glossary
Environmental & Social Attributes
Transformations Newsletter
Video
Presentations
Follow @PlutonicPower on Twitter
Follow Plutonic on Facebook
(Click on any image to enter slideshow)
Progress over the past few months on the East Toba powerhouse.
1396
KB, approx. 4 minutes, 21 seconds at 56.6Kbps
East Toba powerhouse with backfill nearly complete. The mouth of the tailrace can be seen centre-front of the photo.
209
KB, approx. 40 seconds at 56.6Kbps
More rebar is swung on to the floor platform by crane and positioned by a Kiewit worker.
163
KB, approx. 31 seconds at 56.6Kbps
Rebar being tied within the powerhouse floor slab.
246
KB, approx. 47 seconds at 56.6Kbps
An aerial view over the East Toba Powerhouse and up the penstock alignment.
118
KB, approx. 23 seconds at 56.6Kbps
View from the East Toba Powerhouse up the penstock alignment.
123
KB, approx. 24 seconds at 56.6Kbps
Positioning a penstock connection for welding.
122
KB, approx. 24 seconds at 56.6Kbps
Tack welding guides to the penstock in preparation for the next pipe section.
107
KB, approx. 21 seconds at 56.6Kbps
Looking down the penstock to the East Toba powerhouse.
109
KB, approx. 21 seconds at 56.6Kbps
Aerial view of the East Toba intake structure. (1)
177
KB, approx. 34 seconds at 56.6Kbps
Aerial view of the East Toba intake structure. (2)
182
KB, approx. 35 seconds at 56.6Kbps
Rebar on the spillway at the East Toba intake.
214
KB, approx. 41 seconds at 56.6Kbps
Head gate portal and transition structure to the penstock at the East Toba intake.
124
KB, approx. 24 seconds at 56.6Kbps
Inside, looking out through the transition structure.
162
KB, approx. 31 seconds at 56.6Kbps
Aerial view over the Montrose intake structure, looking down the valley. Water flows through the temporary diversion to the right in the photo.
112
KB, approx. 22 seconds at 56.6Kbps
Aerial view over the Montrose intake structure.
187
KB, approx. 36 seconds at 56.6Kbps
Aerial view over the Montrose intake structure. Looking upstream.
180
KB, approx. 34 seconds at 56.6Kbps
Concrete formwork in place at the Montrose intake structure.
118
KB, approx. 23 seconds at 56.6Kbps
The concrete walls from the bottom of the spillway collector channel.
66
KB, approx. 13 seconds at 56.6Kbps
Rebar and channel ties ready for an abutting concrete wall to be formed and poured.
173
KB, approx. 33 seconds at 56.6Kbps
Crews connecting ends of the conductor cable on the transmission line. (1)
125
KB, approx. 24 seconds at 56.6Kbps
Crews connecting ends of the conductor cable on the transmission line. (2)
106
KB, approx. 21 seconds at 56.6Kbps
© 2010 Plutonic Power Corporation. All rights reserved. All material used and displayed on this website, including but not limited to photographs, videos, text, graphics and images ("Content") is the property of Plutonic Power Corporation or its suppliers. All Content is protected under Canadian and international copyright laws and treaties. You may temporarily download Content for personal transitory viewing, provided that: (a) use of the Content is for informational and non-commercial personal use only and no Content may be copied or posted on any network computer, used for public display or broadcast in any media, and (b) no modification of any Content is made. The reproduction, distribution, performance, display, retransmission, broadcast, modification, dissemination, and any use other than non-commercial, non-public personal use, of any Content is expressly prohibited without the prior written permission of Plutonic Power Corporation. To inquire about the use of any Content on this website, please contact us @ 604-669-4999 or
info@plutonic.ca
.
Home
Corporate
Investors
Projects
Consultation
Media
Links & Events
Contact
Disclaimer
Suite 600 : 888 Dunsmuir Street : Vancouver, BC : Canada : V6C 3K4